PV-site portfolio (demo)

"Expense" below refers to:
   Combined PG&E + CCA electric expense.

All results below are specific to the last 12 billing periods:
    October 2025 thru September 2026.


expense offset

Expense and expense offset per site.

groupsite nameexpense
if no pv
real expense
with pv
expense
offset
1A277,38463,997213,387
1B148,7152,777145,938
1C324,385122,341202,044
1D227,093141,00386,090
1E294,62879,007215,620
2F121,25233,55487,698
2G168,02846,843121,185
2H164,93327,809137,125
2I94,19918,22175,978
2J41,83717,30724,530
2K141,86045,41596,446
2L148,55251,92996,623
2M131,92150,83781,084
2N141,35235,989105,363
2O136,82244,76092,062
2P152,14532,979119,166
2Q126,5341,649124,885
2R172,82866,373106,454
expense
if no pv
real expense
with pv
expense
offset
group 11,272,204409,126863,078
group 21,742,263473,6631,268,600
total3,014,467882,7882,131,678

production

PV system production.

groupsite namepv system size
(dc kw)
total production
(ac kwh)
production per kw
(ac kwh / dc kw)
100% prod. per kw
(ac kwh / dc kw)
1A399512,1881,2841,412
1B252365,1221,449-
1C336484,3311,441-
1D401215,0215361,376
1E483520,6471,0781,425
2F147208,1321,417-
2G226292,2701,2911,364
2H263326,5041,2411,368
2I122180,8461,478-
2J4357,7681,348-
2K165231,3951,4001,456
2L171229,3941,3391,460
2M200195,0919751,206
2N171249,7471,4571,460
2O193219,2671,1371,397
2P202284,1411,4071,452
2Q239322,1281,3501,377
2R184253,3881,3801,508
pv system size
(dc kw)
total production
(ac kwh)
production per kw
(ac kwh / dc kw)
100% prod. per kw
(ac kwh / dc kw)
group 11,8712,097,3091,1211,418
group 22,3273,050,0701,3111,404
total4,1985,147,3791,2261,410

lost offset

At today's rates...

The expense with the down inverters left down, vs. the expense with every inverter up.

groupsite nameexpected expense
with down inverters
expected expense
if 100% uptime
lost expense
offset
1D219,370329219,041
2G44,46937,5066,963
2H30,81813,69717,121
2K59,63139,22520,407
2L50,25440,9879,266
2M52,49929,62622,873
2P44,38026,81317,566
2Q2,5133292,184
2R71,59454,21717,376
expected expense
with down inverters
expected expense
if 100% uptime
lost expense
offset
total575,526242,729332,797

down inverters

The inverters down now, and the expected production loss over the next year.

groupsite nametotal inverter
count
down inverter
count
down inverters
as % of total
lost production
vs. 100% up-time
1D11100.0%551,855
2G1615.7%17,486
2H19312.0%43,187
2K12321.0%50,621
2L1219.2%22,922
2M14323.6%56,994
2P14214.8%43,496
2Q1729.4%30,917
2R12215.3%42,316
total inverter
count
down inverter
count
down inverters
as % of total
lost production
vs. 100% up-time
total1171830.4%859,793


Each inverter that's down now.

groupsite namedown inverter
name
attached pv
(dc kw)
down since
1DD-1401.1026-04-17
2HH-115.3025-05-31
2OO-112.2425-07-17
2GG-115.3025-08-09
2RR-115.3025-08-11
2HH-215.3025-09-09
2MM-115.3025-10-15
2MM-215.3025-10-15
2LL-115.3025-12-25
2OO-215.3026-02-23
2OO-312.2426-03-04
2OO-415.3026-06-15
2QQ-112.2426-07-02
2HH-312.2426-07-18
2RR-215.3026-07-22
2KK-112.2426-07-25
2MM-315.3026-07-28
2PP-115.3026-07-29
2PP-215.3026-07-29
2KK-215.3026-08-04
2QQ-215.3026-08-07
2KK-312.2426-09-11
down inverter
count
attached pv
(dc kw)
total22704.04